Technical Writing

  • Construction project proposals for lighting and power systems projects for Walker Electric, Inc. (Flint, MI)
  • Proposals, design guidelines and departmental procedures, Mentor-Protégé policy and procedures, Scope of Work (SOW), Requests for Quotes (RFQ), specifications editing -Design-Build Group Manager for Faith Technologies, Inc.. (Milwaukee, WI); Grand Wisconsin - Exterior
  • Identified and developed projects; Wrote reports, proposals, procedures, Scope of Work (SOW), Requests for Proposals (RFP), and specifications editing as Client Liaison at The University of Michigan for MWH Americas (Chicago, IL);

UMich Medical CenterUM Catherine Street Sub - Switchgear

 

 

 

 

UM Catherine Street Sub - Vault Exterior UM electrical substation1

 

 

 

 

 

 

 

MDOT_HQ.jpg

  • MDOT SE HQWrote procedures, Scope of Work (SOW), Requests for Proposals (RFP), and specifications editing for T12 fiber optic network installation in Detroit and Chicago for Level 3 Communications (Broomfield, CO) via Fluor Global Services; Level_3_Network_map
  • Wrote procedures, Scope of Work (SOW), Requests for Proposals (RFP), and specifications editing for facilities and infrastructure projects at General Motors’ Technical Center (Warren, MI);

GM Warren Tech Center

 

 

 

 

  • Researched, verified and reported findings for forensic engineering evaluation of archived construction documents for Kewanee Nuclear Power Plant;
  • Verified and reported on as-built compliance with engineering design parameters at Watts Bar Nuclear Power Plant (TVA);
  • Wrote procedures and design guides for SCADA system design for the Transmission & Substation Division of Sargent & Lundy (Chicago, IL).

Substation towers TVA Nuclear kewaunee nuclear plant